  MTB Park

North Face Perfection process number 2

  • March 20, 2010
  • 10:00 AM - 04:30 PM
  • The top end of North Face

If you are keen to build that perfect flowy corner, to widen the trail here and there, chip some rock if needs be, re-camber some existing trail, or introduce a better swerve around a native tree or just make North Face as Perfect as it could be, please come along.

 

The plan is to work down from the very start at the 4WD track, (which is 100m from the summit, down the 4wd track, right next to T3 and Trickle falls) and re-examine everything to ensure Perfection!

 

Will the track drain well? Are there spikey stumps that must go? Will the track be as awesome to ride as possible? There is nothing stopping us from polishing this diamond into something very very special.

 

See you at the top from 10am !

 